WABi Systems offers flat-pack construction kits that include all materials needed for a home’s shell: structural elements, wall panels, roofing, cladding, deck, doors, and glazing. For orders of 5 or more, we also provide a prefabricated bathpod for easier installation.

 

Our kits do not include labor, electrical or plumbing components, or personalized items (except for large projects).

We focus on providing everything necessary for the lock-up stage, allowing clients to choose and purchase local cabinetry, paint, kitchens, fixtures, and appliances, keeping costs down and giving clients control over their project’s aesthetics and budget.

Wander at The Overflow_Juberra_4_Credit_Carin Garland
broad indication costs

Installation

Video thumbnail

WABi installation is cost-effective due to its fast assembly, saving clients on overall project costs compared to traditional construction. For instance, installing a 50m² WABi typically requires only about 300 man-hours.

In Australia, the installation cost usually ranges from 70% to 100% of the supply kit cost, so doubling the supply cost gives a rough estimate of the total expense. This is generally more affordable than conventional methods.
Internationally, lower labor rates can reduce installation costs to about 50% of the supply kit price. Costs may vary for remote locations or custom features.

australia
FOR WESTERN AUSTRALIAN ORDERS
Currently, WABi Constructions can only provide installation on jobs within Western Australia. Obtaining a quote for installation may take a few weeks as we source the best local trades for your project.
Asset 19
+5 unit orders Interstate & Overseas
If you are interstate or overseas, you will need a builder. WABi can put you in contact with a recommended builder close to your site. If required, WABi can send a construction manager for initial installation support and training.
Asset 19
1-5 unit orders Interstate & Overseas
If you are interstate or overseas, you will need a builder. Currently we are building our National Builders Network to better accommodate individual project clients.

Assessing if WABi Suits You

Building a WABi follows the same process as constructing a traditional house, so you need to ensure it’s feasible for your site and secure council planning/building approval. To determine if a WABi suits your needs, start with a Feasibility Assessment. You can either:

• Engage a local architect or planner to guide you through the process.

• Collaborate with us at WABi, who can assist you throughout.

In either case, the following steps are essential:

default

Feasibility Assessments

Cost: $2,000 through WABi

Duration: 1-2 weeks

Includes: Preliminary assessment of regulations, land zoning, and site opportunities/constraints.

Planning Approval

Cost: Varies based on plan and local council

Pre-Submission: 1-2 weeks

Approval Time: 6-8 weeks

Includes: BAL Report, Feature Survey, Geo Tech, Flora and Fauna Assessment.

Building Approval

Cost: Varies based on plan and local council

Pre-Submission: 4 weeks

Approval Time: 10 working days

Includes: Engineered Site Approval, Energy Efficiency Report, BCA Report, Wind Region.

customised to suit you

Bespoke Floor Plans

Asset 21
Minor Floor Plan Modification

$500

Includes new locations for windows and doors within the WABi Panel system.

Asset 21
Major Floor Plan Modification

$2,000

Includes up to 3 architectural changes to an existing WABi floor plan.

Asset 21
BRING YOUR OWN Floor Plan drawings

$2,000

Allows integration of your own floor plan with WABi system (for orders of 5+ units).

Asset 21
COMPLETE CUSTOM Bespoke Design

$10,000

Custom floor plans for significant alterations (for orders of 5+ units).

Find out more

Please check out our FAQs designed to answer common questions and provide valuable insights into our processes.

IMG_4954