fbpx

Choose WABi for fast, hassle-free builds with efficient, modular systems and sustainable design—ideal for remote sites and low-skilled teams.

WHY WABI

Rapid Build, Lasting Value

As housing costs rise and skilled trades become scarce, traditional construction methods are no longer sufficient. WABi Systems meets this challenge with high thermal efficiency and rapid build times, offering a sustainable and forward-thinking solution for modern living.

advantages-pic2
WHY WABI

x3 Faster

than traditional construction
WABi Systems can deliver construction projects three times faster thanks to our in-house architects and engineers. Their expertise, combined with our rapid manufacturing processes and prefabricated parts, enables us to significantly accelerate construction timelines.
WABI Construction
Traditional Construction
x3 Faster
DESIGN &
ENGINEERING
MANUFACTURE
DELIVERY
CONSTRUCTION
DESIGN &
ENGINEERING
TENDER
CONTRACT
PROCUREMENT
OF MATERIALS
CONSTRUCTION
1-2 Weeks
Design
120 Days
Manufacture
1-2 Weeks
Delivery
Construction
> 3 MONTHS
= < 12 MONTHS
6 Weeks
Design
6 Weeks
Engineering
6 Weeks
Specification
2 Months
Tender
Contract
2 Months
Delivery
Construction
+ 1.5 Years
= + 2.5
YEARS
Asset 20
RAPID CONSTRUCTION
WABi clients complete installations on average three times faster than traditional construction methods, reflecting our commitment to delivering quick and high-quality building solutions.
Asset 17
REMOTE EXPERTS
WABi ensure swift delivery with streamlined logistics, use only the most durable materials, and leverage advanced prefabrication techniques—all while requiring minimal on-site skilled labour.
handshake
HASSLE FREE
The assembly process is carefully engineered for efficiency, much like assembling a flat-pack—every component, from thermally insulated panels and eco anchors to doors and windows, is designed to fit together perfectly.

DID YOU KNOW? ✔

The WABi Systems features structural galvanised steel flooring!

No need for concrete slabs- This advanced design cuts down on installation time and reduces overall project costs.

WhatsApp Image 2024-10-14 at 15.56.32_9924d7d0
WHY WABI

+ Social Returns

over transportable construction
WABi Systems can be assembled by community members and semi-trained handymen, making construction accessible and cost-effective. This approach not only fosters skills development but also stimulates local economies. By enabling communities to build the units themselves, we save on delivery fees and empower local involvement, driving economic and personal growth.
Local trades

LOCAL TRADES

Skills Icon

SKILLS
GROWTH

Stimulate Icon

STIMULATE
REMOTE
ECONOMY

Efficient system
EFFICIENT
SYSTEM
LOCAL
MATERIALS
SOCIAL
RETURNS
JOB
FULFILLMENT
TIME
JOB SATISFACTION
LOCAL JOB STIMULATION
LOCAL MATERIALS
LOCAL BUSINESS AID
TIME
JOB SATISFACTION
LOCAL BUSINESS AID
WABI Construction
Transportable Construction
WHY WABI

Modular Design

The WABi system has unlimited flexibility, this permits designs to accommodate unique site features, topography, sun angles, cyclonic winds, accessibility, and future needs. We design for maximum volume with a minimum footprint.

Tanja Lagoon Camp 2
WHY WABI

Eco- Friendly Practices

At WABi we respect our earth and its precious resources, which is why we work to ensure we can provide an environmentally, socially and economically positive solution to the typical housing model.

Asset 16
THERMAL STABILISATION
Our patented WABi panels are high performing proprietary structural insulated panels. We are committed to researching, testing and assessing our thermal performance against international rating systems.
Asset 16
BIODIVERSITY PROTECTION
Our Eco Anchor and Lift and Brace Kits are innovative concrete free foundation systems. Environmental protectors, permitting minimal impact to the ground surface, the small footprint allows natural flora and biodiversity to be retained.
Asset 16
CARBON FOOTPRINT REDUCTION
We have designed a building system that can be entirely freighted flat packed. This reduces the carbon emitted through trucks, ships and large machinery needed to be used on typical construction projects.

Completed Projects

Completed Projects Tourism
Wander Cabins
Completed Projects Tourism
Zambezi Lodge
Completed Projects Tourism
Eco Beach Resort
Completed Projects Workers Accommodation
Fremantle Display
Completed Projects Housing
Bridgetown
Completed Projects Housing
Connecticut, USA
Coming Soon Housing
Remote Housing
Completed Projects Tourism
Kailis Manor
Completed Projects Housing
Singleton
Completed Projects Housing
Coolbellup